Skip to main content
Back to the blog
Venue 17 Jun 2026 Fira de Lleida

Process under way to develop the new Fira de Lleida exhibition centre

Process under way to develop the new Fira de Lleida exhibition centre

The terms and conditions of the competition for drafting the preliminary design of the new exhibition centre, which will include the reorganisation of the site and the design of the Fira Zero hall, are published today

The European Union website today, Friday, published the terms and conditions of the competition for drafting the preliminary design of the new Fira de Lleida exhibition centre, thereby officially launching the project to create a larger, versatile and multifunctional exhibition space of 116.000 m2, which will have a significant economic impact and generate employment for the city. The competition for drafting the preliminary design of the new Fira de Lleida exhibition centre will include the preparation of the preliminary design, the basic design and the construction design, as well as the site supervision of Hall Zero, or reception hall – the first to be built – of the exhibition centre.

The deadline for submitting proposals to the call, a restricted competition with a jury promoted by the Fundació La Fira de Lleida and open to architecture firms in general, is 12.00 h on 13 July.

The future exhibition centre, located on the site of the former Hípica de Lleida equestrian grounds, will have a surface area of 116.000 m2 (an increase in space of 43% compared with the current one) and will stand out for its great versatility, since in addition to trade shows it will be able to host a variety of popular, festive, sporting and cultural activities. It will also have a more direct link with La Llotja-Palau de Congressos de Lleida, which will facilitate the holding of business events that use both venues.

It should be recalled that the new exhibition centre will house 5 halls of 5.000 m2 each and the current temporary hall, amounting to a total of more than 27.000 m2 of covered space, in addition to underground car parks located beneath the buildings. Furthermore, the complex will enhance the appearance of the left bank of the river Segre and harmoniously integrate other elements such as the Canal de Seròs.